Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions

Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions

0.00 Avg rating0 Votes
Article ID: iaor20022281
Country: Netherlands
Volume: 74
Issue: 1/3
Start Page Number: 261
End Page Number: 268
Publication Date: Jan 2001
Journal: International Journal of Production Economics
Authors: ,
Keywords: job shop
Abstract:

The trade-off between the length of the lead times quoted to the customers and the delivery reliability has been investigated by many authors. However, only a few studies do this in an economic setting. In this study, the setting of cost optimal due dates taking into account lead-time related and tardiness related costs is investigated. More specifically, in setting the internal due dates, which are used for determining the priorities on the shop floor, and in determining the expected order flow time probability density functions which are used for setting the external due dates, the work load is taken into account. From this study, it follows that this approach leads to (much) lower costs as compared to the situation with workload independent order flow time p.d.f.'s.

Reviews

Required fields are marked *. Your email address will not be published.