Bertrand J.W.M.

J.W.M. Bertrand

Information about the author J.W.M. Bertrand will soon be added to the site.
Found 13 papers in total
Bootstrapping to solve the limited data problem in production control: an application in batch process industries
2006
Batch process industries are characterized by complex precedence relationships among...
The finite horizon economic lot sizing problem in job shops: the multiple cycle approach
2001
This paper addresses the multi-product, finite horizon, static demand, sequencing, lot...
Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions
2001
The trade-off between the length of the lead times quoted to the customers and the...
Using aggregate estimation models for order acceptance in a decentralized production control structure for batch chemical manufacturing
2000
Aggregate models of detailed scheduling problems are needed to support aggregate...
A study of simple rules for subcontracting in make-to-order manufacturing
2001
We study a low volume component manufacturing operation facing order arrival rate...
Customer order lead times for production based on lead time and tardiness costs
2000
In practice decisions regarding customer order lead time and customer order processing...
An aggregate capacity estimation model for the evaluation of railroad passing constructions
2000
The Netherlands Railways operates a double tracked intensively used network of...
Evaluation of three production planning procedures for the use of recipe flexibility
1999
Process industries often obtain their raw materials from mining or agricultural...
Balancing stocks, flexible recipe costs and high service level requirements in a batch process industry: A study of a small scale model
1998
Process industries often obtain their raw materials from mining or agricultural...
Integrating material coordination and capacity load smoothing in multi-product multi-phase production systems
1996
In all papers on capacity load smoothing today, the production situation is always...
Production control in engineer-to-order firms
1993
During the last decade many engineer-to-order firms have tried to implement MRP II...
Flow rate flexibility in complex production departments
1991
Consider a production situation where it is desirable that the production orders of...
Papers per page: