Scheduling the fabrication and assembly of components in a two-machine flowshop

Scheduling the fabrication and assembly of components in a two-machine flowshop

0.00 Avg rating0 Votes
Article ID: iaor20021699
Country: United States
Volume: 31
Issue: 2
Start Page Number: 135
End Page Number: 143
Publication Date: Feb 1999
Journal: IIE Transactions
Authors: ,
Keywords: flowshop
Abstract:

In this paper we study the problem of scheduling the fabrication and assembly of components in a two-machine flowshop so as to minimize the makespan. Each job consists of a component unique to that job and a component common to all jobs. Both the unique and the common components are processed on the first machine. While the unique components are processed individually, the common components are processed in batches and a setup is needed to form each batch. The assembly operations of a job are performed on the second machine, and can only begin when both components for the job are available. We first show that the problem is NP-complete with either batch availability or item availability for the common components. We identify several properties of an optimal solution to the problem, and some polynomially solvable special cases.

Reviews

Required fields are marked *. Your email address will not be published.