Article ID: | iaor20021644 |
Country: | Netherlands |
Volume: | 135 |
Issue: | 1 |
Start Page Number: | 142 |
End Page Number: | 157 |
Publication Date: | Nov 2001 |
Journal: | European Journal of Operational Research |
Authors: | Sakawa Masatoshi, Nishizaki Ichiro, Uemura Yoshio |
Keywords: | personnel & manpower planning, fuzzy sets |
In this paper, we deal with actual problems on production and work force assignment in a housing material manufacturer and a subcontract firm. We formulate two kinds of two-level programming problems: one is a profit maximization problem of both the housing material manufacturer and the subcontract firm, and the other is a profitability maximization problem of them. Applying the interactive fuzzy programming for two-level linear and linear fractional programming problems, we derive satisfactory solutions to the problems. After comparing the two problems, we discuss the results of the applications and examine actual planning of the production and the work force assignment of the two firms to be implemented.