| Article ID: | iaor20021081 |
| Country: | United Kingdom |
| Volume: | 52 |
| Issue: | 6 |
| Start Page Number: | 718 |
| End Page Number: | 723 |
| Publication Date: | Jun 2001 |
| Journal: | Journal of the Operational Research Society |
| Authors: | Yakasai B.M. |
Sometimes a component is removed and thrown away from a unit when it is not working satisfactorily: this could be wasteful in many cases. Some components after removal from a unit may work satisfactorily in another less demanding parallel unit, for a reasonable length of time. Therefore, in this paper we present a cast-off replacement policy that makes maximum utilization of a component that is non-repairable and demanded by two parallel units. A minimum total cost objective function is assumed.