Article ID: | iaor20013782 |
Country: | United Kingdom |
Volume: | 52 |
Issue: | 3 |
Start Page Number: | 271 |
End Page Number: | 282 |
Publication Date: | Mar 2001 |
Journal: | Journal of the Operational Research Society |
Authors: | Kim Yeong-Dae, Lim S.-K. |
Keywords: | procurement |
We consider an integrated problem of plant location and capacity planning for components procurement in knockdown production systems. The problem is that of determining the schedule of opening components manufacturing plants, plans for acquisition of capacities in opened components manufacturing plants, and plans for components procurement in final assembly plants with the objective of minimizing the sum of fixed costs for opening plants, acquisition and operation costs of facilities, and delivery and subcontracting costs of components. The problem is formulated as a mixed integer linear program and solved by a two-stage solution procedure. In the solution procedure, the problem is decomposed into two tractable subproblems and these subproblems are solved sequentially. In the first stage, a dynamic plant location problem is solved using a cut and branch algorithm based on Gomory cuts, while a multiperiod capacity planning problem is solved in the second stage by a heuristic algorithm that uses a cut and branch algorithm and a variable reduction scheme. The solution procedure is tested on problems of a practical size and results show that the procedure gives reasonably good solutions.