| Article ID: | iaor20013291 |
| Country: | Netherlands |
| Volume: | 70 |
| Issue: | 2 |
| Start Page Number: | 125 |
| End Page Number: | 143 |
| Publication Date: | Jan 2001 |
| Journal: | International Journal of Production Economics |
| Authors: | Vrat Prem, Kanda Arun, Garg Suresh |
| Keywords: | simulation: applications, equipment |
Technological flexibility requires very high initial investments and therefore a decision to acquire it is both risky and strategic in nature. The objective of this paper is to find out the technological flexibility requirements in just-in-time manufacturing under different environmental situations. The simulation results show that the incorporation of flexibility in a manufacturing system is vital. The choice of the extent of flexibility is driven by the market and economic factors.