Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Keyword: equipment
Found
68 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Spare parts demand: Linking forecasting to equipment maintenance
2011,
Wang Wenbin
Demand for spare parts is typically intermittent and forecasting the relevant...
Economic design of two‐stage non‐central chi‐square charts for dependent variables
2011,
Tsai Tzong-Ru
Non‐central chi‐square charts are more effective than the joint X ¯...
A portfolio approach to maintenance: a case study of a residential estate
2008,
Chu L K
The choice between repairing and replacing a defective piece of equipment is an...
Fewer equipment changeovers for the embroidery process at Oxford Industries
2007,
Agarwal Anurag
Oxford Industries, Inc., a leading US apparel manufacturer, implemented a scheduling...
Selection criteria for equipment vendors by wafer foundry in Taiwan
2008,
Chou Ying-Chyi
Currently, most semiconductor manufacturers adopt a passive approach in the selection...
Outbound shipment mode considerations for integrated inventory and delivery lot-sizing decisions
2007,
Lee Chung-Yee
We present a two-echelon dynamic lot-sizing model with two outbound delivery modes...
The Netherlands schedules track maintenance to improve track workers' safety
2007,
Hertog D. den
After several fatal accidents, improving the safety of rail-track workers became a...
Network planning of broadband wireless networks
2007,
Bollapragada Ramesh
To deploy broadband networks, service providers, such as competing local exchange...
Optimal equipment replacement without paradoxes: A continuous analysis
2007,
Yatsenko Yuri
Combining known continuous- and discrete-time models of equipment replacement, we show...
Rapid tooling manufacturability evaluation using fuzzy-AHP methodology
2007,
Ravi B.
Rapid tooling (RT) processes driven by rapid prototyping (such as stereolithography...
Due date and cost-based FMS loading, scheduling and tool management
2007,
Storer Robert H.
In this study, we consider flexible manufacturing system loading, scheduling and tool...
Elkem uses optimization in redesigning its supply chain
2006,
Solomon Marius M.
Elkem's silicon division is the largest supplier of silicon metal and ferrosilicon in...
Ensuring access to emergency services in the presence of long internet dial-up calls
2005,
Ramaswami V.
Telephone availability is critical, particularly in emergency situations when people...
Hewlett–Packard combined OR and expert knowledge to design its supply chains
2005,
Kakouros Steve
Although one can eliminate human bias from scenario definitions when modeling supply...
A Florida County locates disaster recovery centers
2005,
Francis Richard L.
In 2001, the Federal Emergency Management Agency (FEMA) required every Florida county...
Hongkong International Terminals gains elastic capacity using a data-intensive decision-support system
2005,
Liu Jiyin
As the flagship of Hutchison Port Holdings (HPH), Hongkong International Terminals...
Improving order-picking response time at Ankor's warehouse
2004,
Dekker R.
Ankor is a wholesaler of tools and garden equipment, carrying such well-known brands...
A decomposition approach for an equipment selection and multiple product routing problem incorporating environmental factors
2004,
Yano Candace A.
We address a medium- to long-term planning problem concerned with choosing...
A logarithmic barrier approach to solving the dashboard planning problem
2003,
Castillo Ignacio
The dashboard planning problem is concerned with finding the most efficient...
The challenge of closed-loop supply chains
2003,
Harrison Terry P.
Closed-loop supply chains differ significantly from forward supply chains in many...
Reconfiguring a remanufacturing line at Visteon, Mexico
2003,
Kekre Sunder
Visteon's remanufacturing facility in Lamosa, Mexico was plagued with heavy...
Closed-loop supply chains for spent batteries
2003,
Rentz Otto
In Germany, a battery decree prescribes measures for collecting and recycling spent...
Enhanced model formulations for optimal facility layout
2003,
Sherali Hanif D.
This paper presents an improved mixed-integer programming (MIP) model and effective...
A fully subjective approach to capital equipment replacement
2003,
Scarf P.A.
The timing of replacement of equipment is dependent on factors like replacement costs,...
1
2
3
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers