Article ID: | iaor20012717 |
Country: | United Kingdom |
Volume: | 38 |
Issue: | 17 |
Start Page Number: | 4235 |
End Page Number: | 4246 |
Publication Date: | Jan 2000 |
Journal: | International Journal of Production Research |
Authors: | Breithaupt Jan-Wilhelm |
Keywords: | control processes |
A dynamic and continuous production model for the planning level, based on methods of control theory, will be presented in this paper. For the control task, a decentral backlog controller has been developed. The controller adjusts the capacity of the individual work system in order to eliminate the backlog as soon as possible. A central WIP-controller secures that only the amount of work that can be handled by means of flexible capacities will be released to the job-shop. The objective is to develop a feedback control for production planning and control with defined control and reference variables based on the logistical objectives.