A genetic algorithm-based fuzzy optimal model for construction time–cost trade-off

A genetic algorithm-based fuzzy optimal model for construction time–cost trade-off

0.00 Avg rating0 Votes
Article ID: iaor20012284
Country: United Kingdom
Volume: 19
Issue: 1
Start Page Number: 47
End Page Number: 58
Publication Date: Jan 2001
Journal: International Journal of Project Management
Authors: , ,
Keywords: heuristics, construction & architecture, fuzzy sets
Abstract:

Owing to different resource utilization, activity duration might need to be adjusted and the project direct cost could also change accordingly. Moreover, activity duration is uncertain due to variations in the outside environment, such as weather, site congestion, productivity level, etc. A new optimal construction time–cost trade-off method is proposed in this paper, in which the effects of both uncertain activity duration and time–cost trade-off are taken into account. Fuzzy set theory is used to model the uncertainties of activity durations. A searching technique using genetic algorithms is adopted to search for the optimal project time–cost trade-off profiles under different risk levels. The method provides an insight into the optimal balance of time and cost under different risk levels defined by decision makers.

Reviews

Required fields are marked *. Your email address will not be published.