Ip W.H.

W.H. Ip

Information about the author W.H. Ip will soon be added to the site.
Found 8 papers in total
A branch and bound algorithm for sub-contractor selector in agile manufacturing environment
2004
Partnership and partner selection play a key role for “Opportunity Driven”...
Genetic algorithm solution for a risk-based partner selection problem in a virtual enterprise
2003
Dynamic alliance and virtual enterprise (VE) are essential components of global...
A heuristic algorithm for machine assignment in cellular layout
2003
This paper presents a heuristic algorithm that addresses problems of machine...
Multi-product planning and scheduling using a genetic algorithm approach
2000
Earliness and tardiness production scheduling and planning (ETPSP) have been studied...
The strategic design and development of enterprise resources planning and real-time monitoring systems
1998
One of the crucial requirements of global manufacturing strategy is the ability to...
Multi-product planning and scheduling using genetic algorithm approach
2000
Earliness and tardiness production scheduling and planning (ETPSP) have been studied...
JIT production planning approach with fuzzy due date for OKP manufacturing systems
1999
In general practice, most customers use a fuzzy due date rather than exact date when...
Simulation study of CONWIP for a cold rolling plant
1998
The CONWIP production control system has received a great deal of attention from...
Papers per page: