Stochastic scheduling on a repairable machine with Erlang uptime distribution

Stochastic scheduling on a repairable machine with Erlang uptime distribution

0.00 Avg rating0 Votes
Article ID: iaor2000805
Country: United Kingdom
Volume: 30
Issue: 4
Start Page Number: 1073
End Page Number: 1088
Publication Date: Dec 1998
Journal: Advances in Applied Probability
Authors: , ,
Abstract:

A set of jobs is to be processed on a machine which is subject to breakdown and repair. When the processing of a job is interrupted by a machine breakdown, the processing later resumes at the point at which the breakdown occurred. We assume that the machine uptime is Erlang distributed and that processing and repair times follow general distributions. Simple permutation policies on both machine parameters and the processing distributions are given which minimize the weighted number of tardy jobs, weighted flow times and the weighted sum of the job delays.

Reviews

Required fields are marked *. Your email address will not be published.