A practical heuristic for the group technology economic lot scheduling problem

A practical heuristic for the group technology economic lot scheduling problem

0.00 Avg rating0 Votes
Article ID: iaor1990136
Country: United Kingdom
Volume: 28
Issue: 4
Start Page Number: 709
End Page Number: 722
Publication Date: Apr 1990
Journal: International Journal of Production Research
Authors: ,
Keywords: heuristics
Abstract:

In some flexible manufacturing systems, group technology principles divide parts naturally into groups so that substantial set-ups occur only when switching production between groups. The authors discuss the scheduling of one such real-life manufacturing process. They develop a practical heuristic for the economic lot scheduling problem in this group technology environment. The heuristic is relatively simple, yet performs well. An example is solved in detail. A computational study verifies the heuristic’s capabilities and suggests extensions for improvement.

Reviews

Required fields are marked *. Your email address will not be published.