Article ID: | iaor1999662 |
Country: | United Kingdom |
Volume: | 48 |
Issue: | 8 |
Start Page Number: | 834 |
End Page Number: | 842 |
Publication Date: | Aug 1997 |
Journal: | Journal of the Operational Research Society |
Authors: | Kunnathur A.S., Sundararaghavan P.S., Viswanathan I. |
In this study, a new class of proportional parallel flow shop problems with the objective of minimizing the makespan has been addressed. A special case for this problem in which jobs are processed on only one machine as opposed to two or more machines in a flow shop, is the well-known multiple processor problem which is NP-complete. The parallel processor problem is a restricted version of the problems addressed in this paper and hence are NP-complete. We develop and test heuristic and simulation approaches to solve large scale problems, while using exact procedures for smaller problems. The performance of the heuristics relative to the LP lower bound as well as a comparison with the truncated integer programming solution are reported. The performance of the heuristics and the simulation results were encouraging.