Article ID: | iaor1999620 |
Country: | United Kingdom |
Volume: | 35 |
Issue: | 11 |
Start Page Number: | 3133 |
End Page Number: | 3156 |
Publication Date: | Nov 1997 |
Journal: | International Journal of Production Research |
Authors: | Rajendran C., Sharadapriyadarshini B. |
Keywords: | Kanbans |
We address the problem of scheduling in a Kanban-controlled flowshop with dual blocking mechanisms. The flowshop is also characterized by missing operations for part-types. We first present recursive equations for time-tabling of containers in a given sequence. We then present two heuristics for scheduling with the objectives of minimizing the sum of weighted waiting-time of containers and weighted flowtime of part-types. An extensive computational evaluation of the proposed heuristics is also presented.