Dynamic job assignment heuristics for multi-server bath operations – a cost based approach

Dynamic job assignment heuristics for multi-server bath operations – a cost based approach

0.00 Avg rating0 Votes
Article ID: iaor1999605
Country: United Kingdom
Volume: 35
Issue: 11
Start Page Number: 3063
End Page Number: 3093
Publication Date: Nov 1997
Journal: International Journal of Production Research
Authors: , ,
Keywords: heuristics
Abstract:

In many industries production facilities are used which process products in a batch-wise manner. Guided by research in the aircraft industry, where the process of hardening synthetic aircraft parts was studied, we propose a new control strategy for these types of systems. Given the availability of information on a few near future arrivals the strategy decides on when to schedule a job in order to minimize logistical costs. The fact that different cost structures can be incorporated, makes it a valuable tool for use in practical situations in business. The potential of the new strategy is demonstrated by an extensive series of simulation experiments, in which its response for various system configurations was tested in comparison with existing heuristics.

Reviews

Required fields are marked *. Your email address will not be published.