| Article ID: | iaor1999119 |
| Country: | United States |
| Volume: | 43 |
| Issue: | 11 |
| Start Page Number: | 1577 |
| End Page Number: | 1588 |
| Publication Date: | Nov 1997 |
| Journal: | Management Science |
| Authors: | Moinzadeh Kamran, Aggarwal Prabhu |
| Keywords: | inspection |
In this paper we study an unreliable bottleneck production/inventory system with a constant production and demand rate that is subject to random disruptions. We assume that the restoration times are constant, the time between breakdowns is exponential, the production setup cost and/or setup time is positive, and excess demand is backordered. We propose an (