| Article ID: | iaor1998724 |
| Country: | United Kingdom |
| Volume: | 17 |
| Issue: | 5 |
| Start Page Number: | 446 |
| End Page Number: | 467 |
| Publication Date: | Jan 1997 |
| Journal: | International Journal of Operations & Production Management |
| Authors: | Narendran T.T., Kumar K. Raj |
| Keywords: | heuristics |
Addresses the problem of sequencing a set of PCBs on a single assembling machine. Considers two objectives, namely minimizing tardiness and minimizing the set-ups. Reduces component change-overs by exploiting the similarity between PCBs. Proposes a new measure to sequence the PCBs, taking care of both the objectives. Develops a heuristic for solving the bi-criteria problem. The proposed method performs better than the existing heuristics for the comparable situation of sequencing in a single machine job-shop.