| Article ID: | iaor19971360 |
| Country: | United Kingdom |
| Volume: | 47 |
| Issue: | 9 |
| Start Page Number: | 1184 |
| End Page Number: | 1191 |
| Publication Date: | Sep 1996 |
| Journal: | Journal of the Operational Research Society |
| Authors: | Mosheiov Gur |
This paper studies a problem of scheduling deteriorating jobs, i.e. jobs whose processing times are an increasing function of their starting times. It considers the case of a simple machine and linear job-independent deterioration. The objective is to minimize the sum of weighted completion times, with weights proportional to the basic processing times. The optimal schedule is shown to be