Article ID: | iaor1997468 |
Country: | United Kingdom |
Volume: | 34 |
Issue: | 10 |
Start Page Number: | 2863 |
End Page Number: | 2878 |
Publication Date: | Oct 1996 |
Journal: | International Journal of Production Research |
Authors: | Ghobbar A.A., Friend C.H. |
Keywords: | maintenance, repair & replacement |
This paper includes the results of a sample survey of the reorder point system (ROP) in airline operator and maintenance service organizations. The presentation provides, at an executive level, an overview of the use of the traditional ROP system by companies to control their spare parts inventory. The survey shows that many companies, unsatisfied with their existing system, were looking for alternative concepts along the lines of the material requirements planning system.