Article ID: | iaor1997458 |
Country: | United Kingdom |
Volume: | 34 |
Issue: | 9 |
Start Page Number: | 2533 |
End Page Number: | 2563 |
Publication Date: | Sep 1996 |
Journal: | International Journal of Production Research |
Authors: | Cao Q., Patterson J.W., Melkonian J. |
Keywords: | simulation: applications |
This paper proposes a three-stage simulation-based approach to determine target inventory level for a plastic moulding company. The classical formula of a periodic review inventory system requires continuous demand with a normal distribution. This is often not the case in real world companies. For this reason, a three-stage approach based on a SLAM II simulation model is proposed. The present model allows for a statistically based determination of target inventory level for both normal and non-normal distributed demand. This model includes inventory management, production planning and control, finished goods shipment, and functional area of manufacturing. Analysis of simulation results indicates an inventory reduction plan and the feasibility of a layout design to relocate equipment for the plant.