Priority-based tool allocation in a flexible manufacturing system

Priority-based tool allocation in a flexible manufacturing system

0.00 Avg rating0 Votes
Article ID: iaor19962015
Country: United Kingdom
Volume: 34
Issue: 7
Start Page Number: 1995
End Page Number: 2018
Publication Date: Jul 1996
Journal: International Journal of Production Research
Authors: ,
Abstract:

The tool allocation problem in a flexible manufacturing system generally aims at (1) maximizing throughput; (2) minimizing machining cost; (3) minimizing system imbalance. This paper presents a heuristic approach of loading a set of tools to the different machining centres in the case of variable machining time. Concepts of fuzzy set theory to determine threshold machining time and a potency index (PI) to prioritize parts are used to solve the problem.

Reviews

Required fields are marked *. Your email address will not be published.