Which is better, off-line or real-time scheduling?

Which is better, off-line or real-time scheduling?

0.00 Avg rating0 Votes
Article ID: iaor19952096
Country: United Kingdom
Volume: 33
Issue: 7
Start Page Number: 2053
End Page Number: 2059
Publication Date: Jul 1995
Journal: International Journal of Production Research
Authors:
Abstract:

Existing results on scheduling indicates that off-line methods are better than real-time methods. This paper gives examples to show that the assertion is not true under fairly general conditions. As a by-product, the paper also shows the potential danger of the existing practice which uses the mean values of random variables as input values to deterministic scheduling methods.

Reviews

Required fields are marked *. Your email address will not be published.