Article ID: | iaor19952076 |
Country: | United Kingdom |
Volume: | 33 |
Issue: | 5 |
Start Page Number: | 1187 |
End Page Number: | 1199 |
Publication Date: | May 1995 |
Journal: | International Journal of Production Research |
Authors: | Yih Y., Ge Y. |
Keywords: | production |
This paper studies a crane scheduling problem with time windows in a flow-shop type production system. Feasibility of a state of the system is first discussed. Then, based on the insight derived from the mathematical programming formulation of feasibility, an optimization-based heuristic algorithm for real-time scheduling of the system is developed. Computer simulation on randomly generated problems shows that this algorithm has an excellent performance in maximizing throughput without defective jobs.