Article ID: | iaor1995426 |
Country: | Netherlands |
Volume: | 14 |
Issue: | 5 |
Start Page Number: | 265 |
End Page Number: | 273 |
Publication Date: | Dec 1993 |
Journal: | Operations Research Letters |
Authors: | Atkins Derek, De Shrikanta |
Keywords: | probability |
Substantial savings on overhead costs are often possible for assembly systems, if component lot-sizes can be equalized and synchronized. The authors demonstrate that ‘Single Cycle’ or ‘kitting’ policies for lot sizing are suprisingly robust, by deriving a parameter dependent bound on their worst case performance. Demands are stochastic with full backlogging.