Scheduling the Australian state cricket season using simulated annealing

Scheduling the Australian state cricket season using simulated annealing

0.00 Avg rating0 Votes
Article ID: iaor1995181
Country: United Kingdom
Volume: 45
Issue: 3
Start Page Number: 276
End Page Number: 280
Publication Date: Mar 1993
Journal: Journal of the Operational Research Society
Authors: ,
Keywords: optimization: simulated annealing, scheduling
Abstract:

The 1992/93 Australian domestic state cricket season was scheduled using the method of simulated annealing. This included both first-class matches (four days each) and one-day games. The matches had to be scheduled around international fixtures and had to respect a variety of other constraints of varying importance. The work was carried out in conjunction with the Australian Cricket Board and the results were used with some manual modification to produce the final 1992/93 cricket programme.