Scheduling the Cricket World Cup-A case study

Scheduling the Cricket World Cup-A case study

0.00 Avg rating0 Votes
Article ID: iaor19941505
Country: United Kingdom
Volume: 44
Issue: 11
Start Page Number: 1067
End Page Number: 1072
Publication Date: Nov 1993
Journal: Journal of the Operational Research Society
Authors: ,
Keywords: scheduling, spreadsheets
Abstract:

This paper describes the scheduling of the matches for the 1992 World Cup of Cricket using a heuristic method programmed in Lotus 1-2-3. The many constraints of different types precluded an analytical approach and the authors describe their method and solution.

Reviews

Required fields are marked *. Your email address will not be published.