Article ID: | iaor1994934 |
Country: | United Kingdom |
Volume: | 13 |
Issue: | 11 |
Start Page Number: | 80 |
End Page Number: | 91 |
Publication Date: | Nov 1993 |
Journal: | International Journal of Operations & Production Management |
Authors: | Erenguc S. Selcuk, Zappe Christopher J., Icmeli O. |
Keywords: | scheduling |
A survey of project scheduling problems since 1973 limited to work done specifically in the project scheduling area (although several techniques developed for assembly line balancing and job-shop scheduling can be applicable to project scheduling): the survey includes the work done on fundamental problems such as the resource-constrained project scheduling problem (RCPSP); time/cost trade-off problem (TCTP); and payment scheduling problem (PSP). Also discusses some recent research that integrates RCPSP with either TCTP or PSP, and PSP with TCTP. In spite of their practical relevance, very little work has been done on these combined problems to date. The future of the project scheduling literature appears to be developing in the direction of combining the fundamental problems and developing efficient exact and heuristic methods for the resulting problem.