A construction algorithm for the machine layout problem with fixed pick-up and drop-off points

A construction algorithm for the machine layout problem with fixed pick-up and drop-off points

0.00 Avg rating0 Votes
Article ID: iaor1994796
Country: United Kingdom
Volume: 31
Issue: 11
Start Page Number: 2575
End Page Number: 2590
Publication Date: Nov 1993
Journal: International Journal of Production Research
Authors: ,
Keywords: location
Abstract:

A construction algorithm which considers some practical aspects of the machine layout problem is presented. The methodology considers machine dimensions and their input and output locations with flow data. The layout is generated on a continuum, considering the best configuration and orientation of input and output locations of machines to minimize the material flow cost. The location procedure searches along the boundary of existing machines. A bi-criterion optimization approach is proposed to overcome one of the weaknesses inherited by construction procedures. The suggested construction procedure is implemented on a microcomputer and applied to solve some test problems with encouraging results.

Reviews

Required fields are marked *. Your email address will not be published.