Comments on the two-product, single-machine, static demand, infinite horizon lot scheduling problem

Comments on the two-product, single-machine, static demand, infinite horizon lot scheduling problem

0.00 Avg rating0 Votes
Article ID: iaor1994118
Country: United States
Volume: 39
Issue: 3
Start Page Number: 387
End Page Number: 388
Publication Date: Mar 1993
Journal: Management Science
Authors:
Keywords: production
Abstract:

One of the necessary and sufficient conditions derived by F.F. Boctor for feasibility of a repetitive two-product schedule is that the cycle times (T1 and T2) must be integer multiples of some time interval T (Propositions 2, 3 and 4). This result also holds for N-product schedules. However, the proof for Propositions 3 and 4 is not exactly valid and therefore a correction has to be made.