Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Keyword: programming: integer
Found
3058 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Flow management to optimize retail profits at theme parks
2003,
Ahmadi Reza
In many theme parks, stores are located within major attractions to sell related...
A stochastic integer program with dual network structure and its application to the ground-holding problem
2003,
Ball Michael O.
In this paper, we analyze a generalization of a classic network-flow model. The...
Improving crew scheduling by incorporating key maintenance routing decisions
2003,
Barnhart Cynthia
Crew costs are the second-largest operating expense faced by the airline industry,...
An integrated dispatching model for rail yards operations
2003,
Chaudhry Sohail S.
Rail yards dispatcher must determine (1) how cars are transferred from one inbound...
Shortest-path network interdiction
2002,
Wood R. Kevin
We study the problem of interdicting the arcs in a network in order to maximize the...
Global optimization for signomial discrete programming problems in engineering design
2002,
Li Han-Lin
This paper proposes a novel method to solve signomial discrete programming (SDP)...
A connection between cutting plane theory and the geometry of numbers
2002,
Cornujols G.
In this paper, we relate several questions about cutting planes to a fundamental...
Extending Dantzig's bound to the bounded multiple-class binary knapsack problem
2002,
Vanderbeck F.
The bounded multiple-class binary knapsack problem is a variant of the knapsack...
The mathematics of playing golf, or: A new class of difficult non-linear mixed integer programs
2002,
Rinaldi G.
We consider a class of non-linear mixed integer programs with n integer variables and...
A spectral bundle method with bounds
2002,
Kiwiel K.C.
Semidefinite relaxations of quadratic 0–1 programming or graph partitioning...
Solving the cell suppression problem on tabular data with linear constraints
2001,
Fischetti Matteo
Cell suppression is a widely used technique for protecting sensitive information in...
An improved surrogate constraints method for separable nonlinear integer programming
2003,
Nakagawa Yuji
An improved surrogate constraints method for solving separable nonlinear integer...
A two-stage model for the design of supply chain networks
2002,
Nakamura Nobuto
This research aims to develop an analytical model of the supplier selection process in...
Compressed workweek scheduling with differing weekdays and weekends labor demands
2003,
Alfares Hesham K.
The objective of this paper is to develop optimum solutions for the labor scheduling...
Genetic algorithm-based integrated approach to flexible manufacturing system part type selection and machine-loading problem
2002,
Wu Zhiming
Part type selection and machine loading are two interrelated subproblems in production...
Optimization approximations for capacity constrained material requirements planning
2003,
Clark Alistair R.
This paper develops three mixed integer programming models and solution methods to...
Solving project scheduling problems by minimum cut computations
2003,
Mhring Rolf H.
In project scheduling a set of precedence-constrained jobs has to be scheduled so as...
Solution of a min–max vehicle routing problem
2002,
Cook William
We use a branch-and-cut search to solve the Whizzkids'96 vehicle routing problem,...
Sire selection with multiple objectives
2002,
Stokes J.R.
The principal objective of any dairy breeding program is to increase the profitability...
Livestock manure systems for swine finishing enterprises
2002,
Stonehouse D.P.
Mixed integer programming (MIP) models were used to generate optimal whole farm plans...
Cost efficiency benchmarking for operational units with multiple cost drivers
2000,
Troutt Marvin D.
We consider the activity-based costing situation, in which for each of several...
Accurate estimation of expected coverage: Revisited
2003,
Saydam Cem
As noted in several studies, the accurate estimation of expected coverage is an...
Discrete sequential search with group activities
2001,
Wagner Bret J.
Equipment failures can have significant implications in terms of cost and customer...
Flexible 4-day workweek scheduling with weekend work frequency constraints
2003,
Alfares Hesham K.
A new integer programming model and a two-stage solution method are presented for the...
First Page
73
74
75
76
77
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers