Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Journal: IIE Transactions
Found
574 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
The block layout shortest loop design problem
2000,
Laporte Gilbert
The purpose of this article is to formulate and solve a shortest loop problem...
Component commonality in multiple-period, assemble-to-order systems
2000,
Hillier M.S.
It has been clearly demonstrated in the literature that introducing a common component...
Quoting manufacturing due dates subject to a service level constraint
2000,
Hopp W.J.
We develop a method for quoting manufacturing due dates to achieve a target service...
Finite-capacity multi-class production scheduling with set-up times
2000,
Kim E.
We treat the scheduling of a single server in a finite-buffer capacity, multi-class,...
A stochastic programming approach to manufacturing flow control
2000,
Haurie A.
This paper proposes and tests an approximation of the solution of a class of...
Auction-theoretic coordination of production planning in the supply chain
2000,
Wu S.D.
Most planning and optimization methods in manufacturing logistics assume centralized...
Dynamic routing and the performance of automated manufacturing cells
2000,
Boucher T.O.
There has been a considerable amount of research done on the ‘cell...
Using aggregate estimation models for order acceptance in a decentralized production control structure for batch chemical manufacturing
2000,
Bertrand J.W.M.
Aggregate models of detailed scheduling problems are needed to support aggregate...
The capacitated lot sizing problem with overtime decisions and setup times
2000,
Ozdamar L.
The Capacitated Lot Sizing Problem (CLSP) consists of planning the lot sizes of...
A comparison of existing grouping efficiency measures and a new weighted grouping efficiency measure
2001,
Sarker B.R.
Grouping efficiency is an evaluative measure of the machine-part groups in cellular...
Balancing mixed-model assembly lines to reduce work overload
2001,
Yano C.A.
We propose a new line balancing approach for mixed-model assembly lines with an...
Intelligent dynamic control policies for serial production lines
2001,
Paternina-Arboleda C.D.
Heuristic production control policies such as constant work-in-progress (CONWIP),...
Tool design problems in a punch press flexible manufacturing system
1998,
Lowe T.J.
In this paper, we study tool design problems encountered in using a punch press...
Production planning for flexible flow systems with limited machine flexibility
1998,
Stecke K.E.
A flexible manufacturing system (FMS) is highly capital-intensive and FMS users are...
Autonomous agents architectures and algorithms in flexible manufacturing systems
2000,
Agnetis A.
This paper investigates possible implementations of the autonomous agents concept in...
Extended kanban control system: Combining kanban and base stock
2000,
Dallery Y.
This paper introduces a new mechanism for the coordination of multi-stage...
A simulated annealing approach to mixed-model sequencing with multiple objectives on a just-in-time line
2000,
Frazier G.V.
This paper presents a Simulated Annealing based heuristic that simultaneously...
The extended kanban control system for production coordination of assembly manufacturing systems
2000,
Dallery Y.
In assembly manufacturing systems there are points in the production process where...
Capacity-constrained reorder intervals for materials requirements planning systems
1997,
Raturi A.S.
This paper develops a model for the reorder interval problem for general production...
Agent-based project scheduling
2000,
Dror M.
Agent technology offers a new way of thinking about many of the classic problems in...
The discrete time/resource trade-off problem in project networks: A branch-and-bound approach
2000,
Demeulemeester E.
In many solution methods for resource-constrained project scheduling, it is assumed...
Gamma distribution parameter estimation for field reliability data with missing failure times
2000,
Coit D.W.
Maximum likelihood estimators have been developed for the gamma distribution when...
Relaxed asynchronous flow-control algorithms for multiclass service networks
2000,
Stidham S.
This paper addresses resource sharing in a multiclass service center. The flow of...
Strongly asymptotically optimal design and control of production and service systems
2000,
Shanthikumar J.G.
In this paper we consider production and service systems that can be modeled as single...
First Page
13
14
15
16
17
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers