Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Journal: European Journal of Operational Research
Found
7937 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Hierarchical production planning in a Make-To-Order company: A case study
1995,
Carravilla Maria Antnia
In this paper, we analyse a complex production planning problem in a Make-To-Order...
A hierarchical approach for capacity coordination in multiple products single-machine production systems with stationary stochastic demands
1995,
Sridharan V.
We introduce a two-level hierarchical planning and scheduling approach for multi-item,...
Hierarchical model for production planning in the case of uncertain demand
1995,
Zpfel Gnther
The paper deals with hierarchical production planning for a multiperiod model...
Progress with single-item lot-sizing
1995,
Wolsey Laurence A.
The goal in this paper is to look at the history of the single-item uncapacitated...
The determination of the optimal component input numbers for the completion of a single manufacturing order
1995,
Nicholls Miles G.
In this paper, the problem posed by attempting to obtain a completed order (i.e., a...
Setup cost stability region for the multi-level dynamic lot sizing problem
1995,
Vrs Jzsef
In this paper the multi-level dynamic lot sizing problem is investigated in which...
Case study based on a multi-period multi-criteria production planning model
1995,
Kalpi Damir
The aim of the described model and procedures is to enable production planning by...
A unified framework for the selection of a Flexible Manufacturing System
1995,
Sueyoshi Toshiyuki
This research addresses the problem of selecting the most appropriate Flexible...
A hierarchical approach for the FMS scheduling problem
1995,
Paulli Jan
This paper considers the scheduling problem in a Flexible Manufacturing System. The...
Ramifications of tool magazine size on the makespan and routing flexibility of flexible manufacturing systems
1995,
Mohamed Zubair M.
Although tool magazine capacity is considered to affect the relative cost of the...
Hierarchically integrated lot size optimization
1995,
Schneewei Christoph
The paper describes a new hierarchically integrated approach to improve conceptual...
On performance measures for evacuation systems
1995,
Lvs Gunnar G.
How can a large, complex building with many occupants be evacuated safely? Before this...
Performance bounds for the effectiveness of pooling in multi-processing systems
1995,
Benjaafar Saifallah
The need for quantifying the effect of resource pooling on performance of...
Determining the optimal warranty price based on the producer's and customers' risk preferences
1995,
Chun Y.H.
We propose a warranty model for the free-replacement, fixed-period warranty policy...
Risk analysis of catastrophes using experts' judgements: An empirical study on risk analysis of major civil aircraft accidents in Europe
1995,
Bign Elizabeth Saers
We present an empirical study performed on risk analysis of major civil aircraft...
An analytical model for the container loading problem
1995,
Lee S.M.
This paper considers the problem of loading containers with cartons of non-uniform...
Symmetric duality for minimax nonlinear mixed integer programming
1995,
Chandra S.
A pair of symmetric dual minimax integer programming problems is formulated and an...
An experiment in scheduling and planning of non-structured jobs: Lessons learned from artificial intelligence and operational research toolbox
1995,
Park Eui H.
Most scheduling problems traditionally address well defined and structured...
A reference direction approach to multiple objective integer linear programming
1995,
Korhonen Pekka
We propose the use of a reference direction/reference point approach to solving...
A fixed interval due-date scheduling problem with earliness and due-date costs
1995,
Chhajed Dilip
In this paper we consider a problem where N jobs are to be scheduled on a single...
Multiple period repair kit problem with a job completion criterion – a case-study
1995,
Gelders L.F.
The repair kit problem is concerned with finding an optimal kit of parts and tools to...
Minimizing makespan for flow shop scheduling by combining simulated annealing with sequencing knowledge
1995,
Enkawa Takao
The present paper reports on a new approach to applying simulated annealing, an...
Logic applied to integer programming and integer programming applied to logic
1995,
Williams H. Paul
The many connections between the methods of Computational Logic and Integer...
Minimizing total tardiness in permutation flowshops
1995,
Kim Yeong-Dae
We consider the permutation flowshop scheduling problem with the objective of...
First Page
253
254
255
256
257
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers