Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Journal: European Journal of Operational Research
Found
7937 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Generalized spanning trees
2000,
Dror M.
In this paper, we propose a definition for the Generalized Minimal Spanning Tree...
Valuation network representation and solution of asymmetric decision problems
2000,
Shenoy Prakash P.
This paper deals with asymmetric decision problems. We describe a generalization of...
Relative measurement and the power function
2000,
Brugha Cathal M.
Relative measurement is considered in the context of Nomology, a theory that defines...
Assessing the quality of negotiated proposals using the REMBRANDT system
2000,
Lootsma Freerk A.
In many negotiating situations one of the bargaining parties is seen to tender...
On the relativity of relative measures – accommodating both rank preservation and rank reversals in the analytic hierarchy process
2000,
Saaty Thomas L.
The analytic hierarchy process (AHP) has been criticized for allowing the introduction...
Generalized golden sections, repeated bisections and aesthetic pleasure
2000,
Lipovetsky S.
We generalize the golden section in the sense that we partition a given line segment...
On the equivalence of two optimization methods for fuzzy linear programming problems
2000,
Chanas Stefan
The paper analyses the linear programming problem with fuzzy coefficients in the...
Differential games with nonconvexities and positive spillovers
2000,
Barucci Emilio
This paper deals with differential games characterized by nonconvexities and...
Scheduling with batching: A review
2000,
Potts Chris N.
There is an extensive literature on models that integrate scheduling with batching...
Scheduling the production of two-component jobs on a single machine
2000,
Potts Chris N.
In this paper, we examine the scheduling of jobs, each of which comprises a standard...
Scheduling jobs with release dates and tails on two unrelated parallel machines to minimize the makespan
2000,
Lancia Giuseppe
In this paper we deal with the problem of assigning a set of n jobs, with release...
A tabu search method guided by shifting bottleneck for the job shop scheduling problem
2000,
Pezzella Ferdinando
A computationally effective heuristic method for solving the minimum makespan problem...
Simultaneous lotsizing and scheduling by combining local search with dual reoptimization
2000,
Meyr H.
The contribution of this paper is twofold. On the one hand, the particular problem of...
Complexity of mixed shop scheduling problems: A survey
2000,
Werner Frank
We survey recent results on the computational complexity of mixed shop scheduling...
The ‘clear-the-largest-work-after-setup’ heuristic for single machine scheduling problem
2000,
Scaronori Kristina
A model for real-time control of flexible manufacturing systems is considered. In this...
Using metaheuristics in multiobjective resource constrained project scheduling
2000,
Sousa Jorge Pinho de
Although single objective metaheuristics are widely spread and applied in many...
The distribution problem, the more for less (nothing) paradox and economies of scale and scope
2000,
Ryan Michael J.
In this paper, I develop a goal programming approach to the representation and...
Minimizing tardy jobs in a flowshop with common due date
2000,
Gupta Jatinder N.D.
This paper considers the two-machine flowshop scheduling problem where the total time...
Quasi-birth-and-death Markov processes with a tree structure and the MMAP[K]/PH[K]/N/LCFS non-preemptive queue
2000,
He Qi-Ming
This paper studies a multi-server queueing system with multiple types of customers and...
On-line scheduling in a surface treatment system
2000,
Proth Jean-Marie
A real-time scheduling algorithm which guarantees an optimal completion time to each...
Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms
2000,
Sakawa Masatoshi
In this paper, by considering the imprecise or fuzzy nature of the data in real-world...
Algorithms for mixed-model sequencing with due date restrictions
2000,
Lovgren Robin H.
In a Mixed-Model Sequencing (MMS) environment, customer demands with respect to...
An evolutionary approach for finding optimal trees in undirected networks
2000,
Smith David K.
In many utilities, such as water and gas, materials are distributed through networks...
Scheduling with limited machine availability
2000,
Schmidt Gnter
This paper reviews results related to deterministic scheduling problems where machines...
First Page
181
182
183
184
185
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers