Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Journal: International Journal of Production Economics
Found
2380 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Real-time operational control of an FMS with full routing flexibility
1997,
Byrne M.D.
This paper considers the operational control of an FMS with flexible alternative...
Selection of routes in a flexible manufacturing facility
1997,
Das Sanchoy K.
Routeing flexibility is defined as the ability to manufacture a product via several...
Selection of postharvest technology routes by mixed-integer linear programming
1997,
Maia Luis Otavio Aleotti
A mixed-integer linear programming model is proposed for the selection of technology...
A decision analysis model for comparing drilling well completion techniques
1997,
Lee Jim
Oil and gas companies continually face decisions on the outlay of capital. One such...
The scientific approach to problem solving and decision support systems
1997,
Sculli D.
This paper discusses some of the critical issues in the study and design of decision...
Assessing success factors for implementing CE: A case study in Hong Kong electronics industry by AHP
1997,
Chin K.S.
This paper examines and evaluates strategic and operational level success factors,...
Policies for lot sizing with setup learning
1997,
Rachamadugu Ram
We address the issue of determining lot sizes in finite horizon environments when...
A goal programming approach to mixed-model assembly line balancing problem
1997,
Erel Erdal
In this paper, a binary goal programming model for the mixed-model assembly line...
Capacity driven due date setting in make-to-order production systems
1997,
zdamar Linet
Due date setting is a difficult task for make-to-order companies and requires...
Integrated distribution, machine assignment and lot-sizing via Lagrangean relaxation
1997,
Vercellis Carlo
The problem of optimally coordinating and integrating complex decisions at the...
A production order quantity model with stochastic demand for a chocolate milk manufacturer
1997,
Tabucanon Mario T.
A production planning model with stochastic demand, constant defective rate and...
An extended economic manufacturing quantity model for a failure prone machine with general lifetime distribution
1997,
Hong Yushin
This paper presents an economic manufacturing quantity (EMQ) model which determines an...
Manufacturing setup cost reduction under variable lead times and finite opportunities for investment
1997,
Sarkar Bhaba
Previously, economic order quantity (EOQ) and economic manufacturing quantity (EMQ)...
Business process re-engineering. New applications for the techniques of production engineering
1997,
MacIntosh Robert
This paper assesses the rise of business process re-engineering (BPR) as a new...
Yield comparison of push and pull control methods on production systems with unreliable machines
1997,
Ou Jihong
In just-in-time manufacturing, the pull control method is used to coordinate feeding...
Reengineering the production planning process in the food industry
1997,
Houghton Erne
This paper addresses managerial process reengineering and in particular the...
Stochastic network project scheduling with non-consumable limited resources
1997,
Golenko-Ginzburg Dimitri
This paper presents a newly developed resource constrained scheduling model for a PERT...
Batching to minimize total production time for two part types
1997,
Liao Ching-Jong
Consider the jobs at a bottleneck facility for two subsequent production lines, each...
The scheduling of economic lot sizes on volume flexible production systems
1997,
Khouja Moutaz
Previous efforts on solving the classical economic lot scheduling problem (ELSP)...
Efficient dispatching rules for scheduling in a job shop
1997,
Rajendran Chandrasekharan
We consider in this article the development of new and efficient dispatching rules...
Scheduling policies for remanufacturing
1997,
Srivastava Rajesh
Recoverable product environments are part of strategies to increase product life and...
A note on scheduling of two-stage flow shop with multiple processors
1997,
Suresh V.
This paper considers a two-stage flow shop with multiple processors in each stage. The...
Order release and sequence-dependent setup times
1997,
Missbauer H.
Sequence-dependent setup times lead to a potential for savings in setups if an...
Scheduling in an automated flow shop to minimize cost: backward-meta scheduling method
1997,
Ohashi Kazumasa
Recently, computer integrated manufacturing (CIM) has become the most practical...
First Page
78
79
80
81
82
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers