Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Journal: International Journal of Production Research
Found
2417 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Investigations into the impact of flexibility on manufacturing performance
1993,
Das S.K.
This paper provides investigative insights into the impact of routeing flexibility,...
A scheduling approach for a flexible manufacturing system
1993,
Nawijn W.M.
This paper discusses the scheduling problem of a particular flexible manufacturing...
Design and development of a stochastic high-level Petri net system for FMS performance evaluation
1993,
Wang Hsu-Pin
The main thrust of this study was to develop and implement a Petri net model for...
Modular Petri nets for simulation of flexible production systems
1993,
Righini G.
The use of Petri nets for modelling, analysing and simulating complex distributed...
A simulation analysis of sequencing rules for ASRS in a pull-based assembly facility
1993,
Linn R.J.
Just-in-time (JIT) systems operate on a pull-based production control. The material...
Impact of lot-sizing on the financial performance of dispatching techniques in an MRP-planned fabrication and assembly environment
1993,
Blackstone J.H.
By simulation analysis of a hypothetical MRP-controlled fabrication and assembly shop,...
A structured analysis of material requirements planning systems under combined demand and supply uncertainty
1993,
Gupta S.M.
The effects of the presence of both demand and lead time uncertainties on material...
Optimal positioning of safety stocks in MRP
1993,
Anderson E.J.
The positioning of safety stock in multi-echelon production networks operating in an...
Process capability analysis-A robustness study
1993,
English J.R.
The robustness of two popular process capability ratios, C p and C pk , when the...
Scheduling for machining and assembly in a job-shop environment
1993,
Egbelu P.J.
The problem of scheduling n assembly jobs in a job-shop environment is addressed. Each...
A heuristic algorithm for minimizing total production time for a sequence of jobs on a surface mount placement machine
1993,
Sadiq M.
In the high-mix, low-volume environment faced by many electronics manufacturers, setup...
A comprehensive analysis of group scheduling heuristics in a job shop cell
1993,
Ruben R.A.
This paper describes a broad-based simulation study of the performance of two-stage...
Dynamic single-machine-weighted absolute deviation problem: Predictive heuristics and evaluation
1993,
Nandkeolyar Udayan
The authors address a dynamic single-machine scheduling problem where the objective is...
Time- and cost-based priorities for job shop scheduling
1993,
Benton W.C.
Competitively, cost- and time-based scheduling should provide a firm with a powerful...
Scheduling sequence-dependent jobs on identical parallel machines to minimize completion time criteria
1993,
Guinet A.
The authors consider the problem of scheduling sequence-dependent jobs on identical...
Single-machine scheduling for minimizing total cost with identical, asymmetrical earliness, and tardiness penalties
1993,
Nishiyama N.
Costs of flowtime, earliness and tardiness should be incorporated in real production...
The evaluation of the interaction between dispatching rules and truncation procedures in job-shop scheduling
1993,
Ghosh S.
Previous research has suggested the use of truncation to alleviate problems of high...
Sequencing, dispatching, and switching in a dynamic manufacturing environment
1993,
Tsubone H.
The problem of selection between sequencing and dispatching as a scheduling approach...
Scheduling a flow-line maufacturing cell: A tabu search approach
1993,
Vakharia A.J.
The performance of two heuristic procedures for the scheduling of a flow-line...
A heuristic rescheduling algorithm for computer-based production scheduling systems
1993,
Adiga Sadashiv
Generation of new production schedules in response to changes that take place on a...
Selecting allowance policies for improved job shop performance
1993,
Gee E.S.
Relatively little job shop scheduling research has focused on improved due-date...
Batch-scheduling problems through the flowshop with both receiving and delivery in time
1993,
Ohta H.
In scheduling literature, the flowshop problem is usually concerned only with finding...
Minimizing total completion time on batch processing machines
1993,
Lee C.Y.
The authors study the problem of minimizing total completion time on single and...
Precedence constrained TSP applied to circuit board assembly and no wait flowshop
1993,
Chan D.
The travelling salesman problem formulation is extended to allow precedence...
First Page
81
82
83
84
85
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers