Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Journal: International Journal of Production Research
Found
2417 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Integrating order release control with due-date assignment rules
1997,
Li R.-K.
This study integrates order release control methods with due-date assignment rules and...
Representation and selection of assembly sequences in computer-aided assembly process planning
1997,
Gottipolu R.B.
In order to determine the best sequence to be used for the assembly of a product, all...
An action strategy generation framework for an on-line scheduling and control system in batch processes with neural networks
1997,
Muraki M.
An on-line scheduling and control system in batch process management consists of three...
On the equivalence of operational performance measurement and multiple attribute decision making
1997,
Parkan C.
Measurement of operational performance and decision making under multiple attributes...
Boundary defect recognition using neural networks
1997,
Kim T.
This research presents schemes for automated visual inspection for boundary defects...
An uncertainty importance measure of activities in PERT networks
1997,
Cho J.G.
In a PERT network, the importance of each activity needs to be assessed in order to...
Simultaneous scheduling of workpieces, fixtures and cutting tools within flexible machining cells
1997,
Rahimifard S.
The planning and scheduling of flexible machining cells is a problem of well-known...
A parametric procedure for multicriterion sequence scheduling for Just-In-Time mixed-model assembly lines
1997,
Aigbedo H.
The sequencing of products for final assembly in JIT mixed-model manufacturing systems...
Maximum principle-based methods for production scheduling with partially sequence-dependent setups
1997,
Maimon O.
This paper introduces a continuous-time optimal control approach to cope with...
Simple priority rule combinations. An approach to improve both flow time and tardiness
1997,
Barman S.
Prior research indicates that no single priority rule displays superior performance on...
A max-algebra approach to the robust distributed control of repetitive AGV systems
1997,
Zaremba M.B.
This paper presents a new approach for distributed control of automatic guided vehicle...
A station model for continuous materials flow production systems
1997,
Yeralan S.
This study develops a station model for continuous flow production systems. The most...
A fuzzy linguistic approach to data quantification and construction of distance measures for the part family formation problem
1997,
Bector C.R.
Most of the techniques related to part family formation require precise numerical data...
Adaptive pull-type production control using Kalman filters
1997,
Quintana R.
The purpose of this research was to design a closed-loop process control methodology...
A decomposition model for continuous materials flow production systems
1997,
Yeralan S.
This study presents a general and flexible decomposition method for continuous...
An objective-guided ortho-synapse Hopfield network approach to machine grouping problems
1997,
Zolfaghari S.
This paper reports an ortho-synapse Hopfield network (OSHN) for solving machine...
Kitting in multi-echelon, multi-product assembly systems with parts substitutable
1997,
Chen J.F.
The kitting problem in multi-echelon, multi-product assembly systems with parts...
Design of a rule-based flexible manufacturing system controller using modified IDEF0 methodology
1997,
Chen S.G.
This article proposes a new method to design a rule-based FMS controller. This...
A robust design methodology for Kanban System design
1997,
Vakharia Asoo J.
Many companies are interested in implementing just-in-time (JIT) manufacturing...
The vertex splitting algorithm for facilities layout
1997,
Giffin J.W.
The graph theoretic facility layout problem (GTFLP) seeks the best spatial arrangement...
Implementing a real option model for valuing an undeveloped oil field
1997,
Cortazar Gonzalo
We present a no arbitrage model for evaluating an undeveloped oil field and its...
DoorFAST; A constructive procedure to optimally layout a facility including aisles and door locations based on an aisle flow distance metric
1997,
Foote B.L.
A methodology for designing a layout for factories, office buildings or homes is...
A new approach to the block layout problem
1997,
Irvine S.A.
The main problem concerned with applying graph theory to facilities layout is the...
Multi-period international facilities location: An algorithm and application
1997,
Khumawala B.M.
In today's markets, customers want to buy the best quality products at the lowest...
First Page
61
62
63
64
65
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers