Country: Netherlands

Found 18376 papers in total
A note on optimal assignment of slack due-dates in single-machine scheduling
1993,
This paper extends T.C.E. Cheng’s approach for optimal assignment of slack...
Algorithms for preemptive scheduling of different classes of processors to do jobs with fixed times
1993,
The authors consider scheduling problems that involve processors of different classes...
A priority rule for minimizing weighted flow time in a class of parallel machine scheduling problems
1993,
The problem of scheduling n jobs with known process times on m identical parallel...
Two parallel machine sequencing problems involving controllable job processing times
1993,
In this note the authors consider a problem of scheduling n single-operation jobs on m...
The complexity of scheduling jobs in repetitive manufacturing systems
1993,
The authors study the problem of finding cyclic schedules in the flowshop, openshop...
Worst-case analysis of heuristics for open shops with parallel machines
1993,
The paper considers the multi-stage open shop scheduling problem wit a numbe of...
An approximation algorithm for the m-machine permutation flow shop scheduling problemwith controllable processing times
1993,
This paper deals with the m- machine permutation flow shop scheduling problem in which...
Two machine open shop scheduling problem to minimize an arbitrary machine usage regular penalty function
1993,
The paper presents a linear-time algorithm for solving the two machine open shop...
On scheduling influential stochastic tasks on a single machine
1993,
A single machine is available to process a collection of stochastic tasks in a manner...
Performance of scheduling algorithms for no-wait flowshops with parallel machines
1993,
The paper studies the performance of scheduling algorithms for a manufacturing system,...
Job selection and sequencing on a single machine in a random environment
1993,
The authors examine a single machine scheduling problem with random processing times...
Some remarks about the ‘equivalence’ of performance measures in scheduling problems
1993,
This note addresses different classes of equivalence results concerning scheduling...
Batch scheduling to minimize total completion time
1994,
The paper addresses single and multiple machine versions of the batch scheduling...
Scheduling shops to minimize the weighted number of late jobs
1994,
The problem of scheduling jobs with a common due date d so that the weighted number of...
A comment on ‘a simple sequencing algorithm for mixed-model assembly lines in just-in-time production systems’
1994,
Recently Ding and Chen have published an O( nD) heuristic for the level schedule...
Selecting among scheduled projects
1995,
The authors demonstrate a rule for optimally selecting m among n scheduled projects...
Lot sizing in a no-wait flow shop
1995,
The authors consider a no-wait flow shop which manufactures large numbers of copies of...
The decision to introduce new technology: The fuzzy preliminary selection Decision Support Problem
1996,
In the early stages of the design of large scale engineering systems, understandably,...
A concept exploration method for determining robust top-level specifications
1996,
In the early stages of design of complex systems, it is necessary to explore the...
Synthesis of joint replenishment policies for inventory systems when demand is lumpy
1996,
This paper is concerned with the synthesis of control policies for inventory systems...
An analytical comparison of inventory costs between the pull and the parts-oriented production systems
1996,
This paper presents nomographs for evaluating the relative size of parts inventory...
Comparative analysis of ordering models for an international co-operative global complementary production system
1996,
In recent years, international co-operative global complementary production systems...
A production ordering system for two-item, two-stage, capacity-constraint production and inventory model
1996,
This paper proposes an effective production ordering system for two-item, two-stage,...
A comment on Martin’s: Note on an EOQ model with a temporary sale price
1996,
This note comments on an earlier paper published in this journal.
Papers per page: