Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Country: Netherlands
Found
18376 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Does updating judgmental forecasts improve forecast accuracy?
2000,
Remus William
This study investigates whether updating judgmental forecasts of time series leads to...
Generalized golden sections, repeated bisections and aesthetic pleasure
2000,
Lipovetsky S.
We generalize the golden section in the sense that we partition a given line segment...
Decision support for fuzzy comprehensive evaluation of urban development
1999,
Xu Li D.
Urban development often impacts the economic development pattern and the spatial...
On the equivalence of two optimization methods for fuzzy linear programming problems
2000,
Chanas Stefan
The paper analyses the linear programming problem with fuzzy coefficients in the...
Robust concept exploration of propulsion systems with enhanced model approximation capabilities
2000,
Chen Wei
Improvements in industrial productivity require the creation of a reliable design in...
Forecasting the levels of vector autoregressive log-transformed time series
2000,
Franses Philip Hans
In this paper we give explicit expressions for the forecasts of levels of a vector...
Differential games with nonconvexities and positive spillovers
2000,
Barucci Emilio
This paper deals with differential games characterized by nonconvexities and...
Scheduling of thermal units with a nonlinear load flow network model
1999,
Thomas Robert J.
We describe a formulation of the thermal unit commitment problem that includes AC...
Scheduling with batching: A review
2000,
Potts Chris N.
There is an extensive literature on models that integrate scheduling with batching...
Scheduling the production of two-component jobs on a single machine
2000,
Potts Chris N.
In this paper, we examine the scheduling of jobs, each of which comprises a standard...
Scheduling jobs with release dates and tails on two unrelated parallel machines to minimize the makespan
2000,
Lancia Giuseppe
In this paper we deal with the problem of assigning a set of n jobs, with release...
A tabu search method guided by shifting bottleneck for the job shop scheduling problem
2000,
Pezzella Ferdinando
A computationally effective heuristic method for solving the minimum makespan problem...
Simultaneous lotsizing and scheduling by combining local search with dual reoptimization
2000,
Meyr H.
The contribution of this paper is twofold. On the one hand, the particular problem of...
An implementation of a graph-based modeling system for structured modeling (GBMS/SM)
1998,
Chari Kaushal
This paper describes GBMS/SM, a graph-based modeling system based on structured...
Complexity of mixed shop scheduling problems: A survey
2000,
Werner Frank
We survey recent results on the computational complexity of mixed shop scheduling...
The ‘clear-the-largest-work-after-setup’ heuristic for single machine scheduling problem
2000,
Scaronori Kristina
A model for real-time control of flexible manufacturing systems is considered. In this...
Using metaheuristics in multiobjective resource constrained project scheduling
2000,
Sousa Jorge Pinho de
Although single objective metaheuristics are widely spread and applied in many...
Modeling variables of different frequencies
2000,
Abeysinghe Tilak
The transformation introduced in Abeysinghe to model dynamic regressions with...
The distribution problem, the more for less (nothing) paradox and economies of scale and scope
2000,
Ryan Michael J.
In this paper, I develop a goal programming approach to the representation and...
Minimizing tardy jobs in a flowshop with common due date
2000,
Gupta Jatinder N.D.
This paper considers the two-machine flowshop scheduling problem where the total time...
Quasi-birth-and-death Markov processes with a tree structure and the MMAP[K]/PH[K]/N/LCFS non-preemptive queue
2000,
He Qi-Ming
This paper studies a multi-server queueing system with multiple types of customers and...
On-line scheduling in a surface treatment system
2000,
Proth Jean-Marie
A real-time scheduling algorithm which guarantees an optimal completion time to each...
Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms
2000,
Sakawa Masatoshi
In this paper, by considering the imprecise or fuzzy nature of the data in real-world...
Algorithms for mixed-model sequencing with due date restrictions
2000,
Lovgren Robin H.
In a Mixed-Model Sequencing (MMS) environment, customer demands with respect to...
First Page
405
406
407
408
409
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers