Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Country: Netherlands
Found
18376 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines
2000,
Ding Fong-Yuen
The minimization of the two-stage variation in the mixed-model sequencing problem of...
Applying the computer method of sequencing operations for assembly lines computer heuristic to the constrained resource allocation problem
2000,
DePuy G.W.
Generating a project schedule that meets all activity precedence constraints while...
The exact overall time distribution of a project with uncertain task durations
2000,
Grossmann Ignacio E.
This paper presents a new technique for computing the exact overall duration of a...
On criticality and sensitivity in activity networks
2000,
Elmaghraby Salah E.
A review of the issues related to activity criticality and the sensitivity of the mean...
Improving project cost estimation by taking into account managerial flexibility
2000,
Wallace Stein W.
Project costs tend to be higher than depicted by budgets. Irrespective of the quality...
Optimal timing of project control points
2000,
Erel Erdal
The project control cycle consists of measuring the status of the project, comparing...
An equitable approach to the payment scheduling problem in project management
2000,
Ulusoy Gndz
This study reports on a new approach to the payment scheduling problem. In this...
Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
2000,
Kolisch Rainer
We consider heuristic algorithms for the resource-constrained project scheduling...
A multicriteria heuristic method to improve resource allocation in multiproject scheduling
2000,
Lova Antonio
Many works published in the area of project management make reference to the...
Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
2000,
Neumann K.
This paper deals with resource-constrained project scheduling problems with nonregular...
G-networks: A versatile approach for work removal in queueing networks
2000,
Artalejo J.R.
G -networks (or queueing networks with negative customers, signals, triggers, etc.)...
Multiple class G-networks with list-oriented deletions
2000,
Fourneau J.-M.
We study a new dynamic of generalized networks (G-networks) of queues. We consider...
Reliability modelling using G-queues
2000,
Pitel Edwige
A new technique for modelling unreliable queueing nodes is presented, based on the...
On G-networks and resource allocation in multimedia systems
2000,
Gelenbe Erol
Consider a multimedia-on-demand server who transmits video documents through a...
A permutation flow-shop scheduling problem wth convex models of operation processing times
2000,
Cheng T.C.E.
The paper is an extension of the classical permutation flow-shop scheduling problem to...
Cyclic scheduling in robotic flowshops
2000,
Crama Y.
Fully automated production cells consisting of flexible machines and a material...
Sequencing parallel machining operations by genetic algorithms
1999,
Fang Shu-Cherng
Parallel machines (mill/turn machining centers) provide a powerful and efficient...
Scheduling grouped jobs on single machine with genetic algorithm
1999,
Wang Dingwei
Production scheduling of grouped jobs has been an active research area since Group...
An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy duedate
1999,
Sakawa Masatoshi
In this paper, by considering the imprecise or fuzzy nature of the data in real-world...
A tutorial survey of job-shop scheduling problems using genetic algorithms, part II: Hybrid genetic search strategies
1999,
Gen Mitsuo
Job-shop scheduling problem is one of the well-known hardest combinatorial...
A generalized two-machine flowshop scheduling problem with processing time linearly dependent on job waiting-time
1999,
Chern Maw-Sheng
We consider a two-machine flowshop scheduling problem where the processing times are...
Evaluating simple scheduling rules in a mixed shop environment
2000,
Ferrell W.
The layout and flow of real manufacturing shops are most often neither pure job-shop...
A neural-net approach to real time flow-shop sequencing
2000,
Shaw Michael J.
This paper considers the classic problem of sequencing a set of jobs that arrive in...
Lot streaming and scheduling heuristics for m-machine no-wait flowshops
2000,
Sriskandarajah Chelliah
The objective of this paper is to minimize makespan in m-machine no-wait flowshops...
First Page
390
391
392
393
394
Last Page
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers