Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
Erica L Plambeck
Information about the author Erica L Plambeck will soon be added to the site.
Found
11 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Accurate Emergency Department Wait Time Prediction
2016
This paper proposes the Q‐Lasso method for wait time prediction, which combines...
Introduction to the Special Issue on the Environment
2013
Human population growth and increasing consumption per capita are causing...
OM Forum–Operations Management Challenges for Some ‘Cleantech’ Firms
2013
A ‘cleantech’ firm is one with an innovative technology and/or business...
On the Value of Input Efficiency, Capacity Efficiency, and the Flexibility to Rebalance Them
2013
A common characteristic of basic material manufacturers (which account for 85%...
Implications of Hyperbolic Discounting for Optimal Pricing and Scheduling of Unpleasant Services That Generate Future Benefits
2013
People tend to lack the self‐control to undergo an unpleasant service that...
Delegation vs. Control of Component Procurement Under Asymmetric Cost Information and Simple Contracts
2013
A manufacturer must choose whether to delegate component procurement to her tier 1...
Dynamic Inventory Management with Learning About the Demand Distribution and Substitution Probability
2008
A well–known result in the Bayesian inventory management literature is: If lost...
Asymptotically Optimal Control for an Assemble-to-Order System with Capacitated Component Production and Fixed Transport Costs
2008
This paper examines a two–tier assemble–to–order system. Customer...
Optimal control of a high-volume assemble-to-order system
2006
We consider an assemble–to–order system with a high volume of prospective...
Simple relational contracts to motivate capacity investment: Price only vs. Price and quantity
2007
Because of long lead times associated with product development and building capacity,...
Optimal control of a high-volume assemble-to-order system with maximum leadtime quotation and expediting
2008
For an assemble–to–order system with a high volume of prospective...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers