Bregman Robert L.

Robert L. Bregman

Information about the author Robert L. Bregman will soon be added to the site.
Found 5 papers in total
An analytical framework for comparing Material Requirements Planning to reorder point systems
1994
Material Requirements Planning (MRP) and reorder point (ROP) systems represent two...
A note on optimal order quantities for credit purchases
1992
In this note, optimal purchase quantities are derived for firms that regularly...
Selecting among MRP lot-sizing methods for purchased components when the planning horizon is limited
1991
MRP implementations with numerous bill-of-material levels often result in limited...
A heuristic for the control of inventory in a multi-echelon environment with transportation costs and capacity limitations
1990
This paper develops, demonstrates and tests a heuristic procedure for controlling...
A heuristic algorithm for managing inventory in a multi-echelon environment
1989
The proper management of finished goods inventory in a multi-echelon environment is an...
Papers per page: