Croce F. Della

F. Della Croce

Information about the author F. Della Croce will soon be added to the site.
Found 14 papers in total
An exact algorithm for MAX-CUT in sparse graphs
2007
We study exact algorithms for the MAX-CUT problem. Introducing a new technique, we...
Scheduling the Italian Football League: an ILP-based approach
2006
Scheduling the Italian Major Football League (the so-called ‘Serie A’)...
A greedy-based neighborhood search approach to a nurse rostering problem
2004
A practical nurse rostering problem, which arises at a ward of an Italian hospital, is...
Solving the Hub location problem in telecommunication network design: A local search approach
2004
This article deals with a Hub Location Problem arising in Telecommunication Network...
An enhanced dynasearch neighborhood for the single-machine total weighted tardiness scheduling problem
2004
Based on the work by Congram, Potts and Van de Velde, we develop for the...
Recovering beam search: enhancing the beam search approach for combinatorial optimization problems
2004
A hybrid heuristic method for combinatorial optimization problems is proposed that...
Improving the preemptive bound for the one-machine dynamic total completion time scheduling problem
2003
We consider the single machine dynamic total completion time scheduling problem. This...
A Recovering Beam Search algorithm for the one-machine dynamic total completion time scheduling problem
2002
This paper deals with the one-machine dynamic total completion time scheduling...
A heuristic algorithm for the auto-carrier transportation problem
2002
The delivery of vehicles to dealers is one of the major tasks in the vehicle...
An improved branch-and-bound algorithm for the two machine total completion time flow shop problem
2002
We consider the two machine total completion time flow shop scheduling problem. This...
A new decomposition approach for the single machine total tardiness scheduling problem
1998
This paper deals with the single machine total tardiness problem. From Emmons' basic...
The two-machine total completion time flow shop problem
1996
In this paper we study the NP-hard scheduling problem of minimizing total completion...
Aggregate planning and scheduling in the food industry: A case study
1995
In this work we introduce a production scheduling problem encountered in COMPAL S.A.,...
Cellular control of manufacturing systems
1993
The scope of this paper is twofold. Firstly the authors propose augmented...
Papers per page: