Allahverdi Ali

Ali Allahverdi

Information about the author Ali Allahverdi will soon be added to the site.
Found 39 papers in total
Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications
2002
The multimedia data objects scheduling problem for WWW applications is modeled using...
New heuristics to minimize total completion time in m-machine flowshops
2002
We consider the m -machine permutation flowshop with the objective of minimizing total...
The tricriteria two-machine flowshop scheduling problem
2001
The literature on the two-machine flowshop scheduling problem reveals that the problem...
Minimizing total completion time in a no-wait flowshop with sequence-dependent additive changeover times
2001
This paper addresses the problem of minimizing total completion time in a two-machine...
Algorithms for scheduling jobs on two serial duplicate stations
1999
In automated assembly or production lines, some stations are duplicated due to their...
No-wait and separate setup three-machine flowshop with total completion time criterion
2000
This paper considers the three-machine no-wait flowshop problem with the objective of...
Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times
2000
This paper addresses the two-machine flowshop problem to minimize mean flowtime where...
A review of scheduling research involving setup considerations
1999
The majority of scheduling research assumes setup as negligible or part of the...
Stochastically minimizing total flowtime in flowshops with no waiting space
1999
The problem of sheduling n jobs in a two-machine flowshop with constant and known...
Dual criteria scheduling on a two-machine flowshop subject to random breakdowns
1998
Decision makers often consider multiple objectives when making scheduling decisions....
Total flowtime in no-wait flowshops with separated setup times
1998
This paper addresses the two-machine no-wait flowshop problem where the setup time of...
Scheduling in stochastic flowshops with independent setup, processing and removal times
1997
The two-machine flowshop problem, where setup and removal times are independent from...
Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
1996
This paper addresses the problem of scheduling in a two-machine proportionate flowshop...
Two-stage production scheduling with separated set-up times and stochastic breakdowns
1995
The problem of scheduling a two-machine flowshop, where set-up times are considered as...
Scheduling of m parallel machines subject to random breakdowns to minimize expected mean flow time
1994
The problem of scheduling n jobs on m parallel machines is considered when the...
Papers per page: