Browse Papers
From IFORS
Contact Us
English
Remember me
Login
Forgot password?
S.T. Enns
Information about the author S.T. Enns will soon be added to the site.
Found
12 papers
in total
Date Descending
Date Ascending
Title Descending
Title Ascending
Comparison of supply chain replenishment strategies in a non-capacitated distribution system
2007
This research considers inventory replenishment in a stochastic, non-capacitated,...
Evaluating the effects of capacity constraints and demand patterns on supply chain replenishment strategies
2006
This research considers inventory replenishment in a stochastic, multi-echelon supply...
Multi-product capacity-constrained lot sizing with economic objectives
2004
The capacity-constrained lot-sizing problem with stochastic lot arrivals is especially...
Material requirements planning performance effects due to forecast bias and demand uncertainty
2002
The effects of forecast bias and demand uncertainty in a batch production environment...
Material requirements planning performance effects due to lot size and planned lead time settings
2001
The effects of lot size and planned lead time settings are evaluated in a shop...
The effect of batch size selection on MRP performance
1999
Fixed batch size settings are evaluated under MRP assumptions with batch processing...
Evaluating shop floor input control using rapid modeling
2000
A simple, spreadsheet-based rapid modeling approach to analysis of input control is...
Lead time selection and the behaviour of work flow in job shops
1998
Few studies in job shop scheduling consider dynamic shop load and work flow issues....
Job shop leadtime requirements under conditions of controlled delivery performance
1994
A model that facilities setting due dates on the basis of forecasted flowtimes and...
An integrated system for controlling shop loading and work flow
1995
Effective management of loading and work flow is becoming increasingly important in...
Finite scheduling: Performance comparisons when due dates are internally set
1995
In this study, the performance of two common schedule construction approaches,...
Job shop flowtime prediction and tardiness control using queueing analysis
1993
This paper investigates flowtime prediction under conditions where Jackson’s...
Papers per page:
6 Papers
12 Papers
24 Papers
36 Papers
48 Papers