| Article ID: | iaor19931979 |
| Country: | Netherlands |
| Volume: | 53 |
| Issue: | 2 |
| Start Page Number: | 166 |
| End Page Number: | 171 |
| Publication Date: | Jul 1991 |
| Journal: | European Journal of Operational Research |
| Authors: | Singh N., Kumar P., Tewari N.K. |
A multistage multiobjective decision problem is formulated as a nonlinear goal programming model. The solution algorithm which uses Box-Complex method is presented. The model formation and computational aspects are illustrated on the integrated grouping and loading problem of a flexible manufacturing system.