Level scheduling to minimize schedule length on lots of unit-time jobs

Level scheduling to minimize schedule length on lots of unit-time jobs

0.00 Avg rating0 Votes
Article ID: iaor19931768
Country: Netherlands
Volume: 53
Issue: 1
Start Page Number: 119
End Page Number: 121
Publication Date: Jul 1991
Journal: European Journal of Operational Research
Authors:
Abstract:

A few years ago a researcher attempted to show that one could minimize the total schedule length of lots of unit-time jobs by level scheduling. Unfortunately, this method can fail on problems where jobs have successors at more than one level. In this paper, the method is altered to handle this problem.

Reviews

Required fields are marked *. Your email address will not be published.