Article ID: | iaor19931721 |
Country: | Netherlands |
Volume: | 55 |
Issue: | 1 |
Start Page Number: | 57 |
End Page Number: | 70 |
Publication Date: | Nov 1991 |
Journal: | European Journal of Operational Research |
Authors: | Ravindran A., Lashine Sherif, Foote B. |
Keywords: | scheduling, programming: goal |
This paper presents a nonlinear mixed integer goal programming model of the deterministic, static two-machine closed flow shop problem. The model incorporates two sets of goals that are of importance to the production manager: cost goals and production goals. The cost goals are setup costs, finished goods holding costs, machine idle costs, and work-in-process inventory costs. The production goals are makespan, mean tardiness, mean flow time, capacity between runs and end shop capacity.