Article ID: | iaor2017235 |
Volume: | 28 |
Issue: | 3 |
Start Page Number: | 327 |
End Page Number: | 347 |
Publication Date: | Jan 2017 |
Journal: | International Journal of Operational Research |
Authors: | Wongthatsanekorn Wuthichai, Mayteekriengkrai Nuntana |
Keywords: | scheduling, combinatorial optimization, heuristics, simulation |
Currently, there is a high increase of ready mixed concrete (RMC) demand. Some RMC companies put a strategy to set up plants in different areas. An interesting problem is how to utilise RMC trucks among plants for different types of RMC to minimise total fuel cost of transportation. This research proposes applying bee algorithm (BA) to minimise fuel cost of RMC trucks scheduling from multiple plants to multiple sites (MPMS) for three concrete types which are floor, column and beam. The simulated results are demonstrated by varying customer order and distance between batch plants and construction sites in six case study problems. BA is compared with particle swarm optimisation (PSO) and genetic algorithm (GA). The results indicate that BA outperforms GA and PSO in terms of accuracy and efficiency.