The robust (minmax regret) single machine scheduling with interval processing times and total weighted completion time objective

The robust (minmax regret) single machine scheduling with interval processing times and total weighted completion time objective

0.00 Avg rating0 Votes
Article ID: iaor201530005
Volume: 66
Issue: 4
Start Page Number: 141
End Page Number: 152
Publication Date: Feb 2016
Journal: Computers and Operations Research
Authors:
Keywords: scheduling, combinatorial optimization, programming: branch and bound, heuristics
Abstract:

Single machine scheduling is a classical optimization problem that depicts multiple real life systems in which a single resource (the machine) represents the whole system or the bottleneck operation of the system. In this paper we consider the problem under a weighted completion time performance metric in which the processing time of the tasks to perform (the jobs) are uncertain, but can only take values from closed intervals. The objective is then to find a solution that minimizes the maximum absolute regret for any possible realization of the processing times. We present an exact branch-and-bound method to solve the problem, and conduct a computational experiment to ascertain the possibilities and limitations of the proposed method. The results show that the algorithm is able to optimally solve instances of moderate size (25-40 jobs depending on the characteristics of the instance).